This week was quite the stretch. We were 2 man down and had 13 storefront canopies to make in 5 days. A jig was built out of some steel ibeam and we were lucky enough to get them fabricated and shipped out on Saturday. This week was new for me in a lot of ways with project managing, running a shop floor, and keeping stress levels down!
Busy, busy!
ReplyDeleteGood stuff.